Main navigation

Planning to develop a site, and/or interested to find out if a site is likely to be contaminated?  Your first step should be to get a Phase 1 desk study of the site carried out by an environmental consultant.  If you choose to develop, a Phase 1 may be a planning requirement.

A Phase 1 desk study can set you back anywhere from £400 to over £2,000, this cost will most likely be tied to the size of the site, the greater the site area, the longer it takes to find and interpret the information.  A certain amount of the price will be down to quality.

A Phase 1 desk study involves the collection of as much historical data on a site as practical, then interpreting the information to form a conceptual site model of said site.  Sources include-

  • Historical maps which are a mainstay of this type of report,
  • Aerial photographs,
  • Enquiries to relevant environment agencies and councils,
  • A site walkover, an experienced professional takes a walk around the site looking for any signs of contamination (or lack there of, fingers crossed).

With the above information you should then have a very good idea of what you may find in the ground which helps in site investigation design and likely contaminated land and/or water remediation requirements.  Or by this point, you may want to walk away….

FREE EBOOK

2026

Phase 1 Desk Studies / Preliminary Risk Assessments

Do you want an insight on Phase 1 Desk Studies / Preliminary Risk Assessments for Contaminated Land? This eBook has been written specifically for those new to contaminated land and provides an overview for the uninitiated of what steps you need to follow.

You’re not alone, small & large residential remediation projects have been a part of many contractors portfolio for a long time. A reasonable amount of contamination results from spills, for example a burst kerosene tank, with the rest arising from historical contamination.

Several options for remediation are generally available for these projects, see our services list here for an indication.  We have found that vast majority end up as excavation removal projects.  The fun is carrying them out in confined areas with limited space, and then finishing the work without causing any damage to the property.  This video will show you one example.

http://youtu.be/H5yYg8bwiSU

And the final excavation.

See this blog post from John shows how apparently ‘inaccessible’ materials can be removed.  The guy lived safely in his house for the duration.

As always we’re here to discuss any issues you may have with the aim of finding the best solution for you, so give us a call it you want to know more on 0131 538 8456, or drop us an e-mail at info@soilutions.co.uk.

We are constantly being asked to provide a fixed cost for remediation schemes but is this good value for the client…?

It is very normal for us mere remediation contractors to have had no involvement with the site investigation stage of a sites redevelopment.  For some reason our experience is not called upon until the client needs to know ”how much’ and ‘how long’…? By then the SI is done and dusted and there is no money left in the budget to return to site to collect further data to define or quantify the remediation costs.

So we are left to second guess; the extent of the contamination, whether there are sufficient nutrients present for a bioremediation approach,  what the recharge of the wells are, the PSD of the soil, etc, etc, etc.  Hence, there is a large element of risk.  And where there is risk there are added costs.  So if the client wishes us to take on this risk we have to allow for it in our pricing structure.  Simple stuff.

But what about another approach…?  In construction projects it is normal to have a Project Manager, Architect, Structural Engineer, QS, M&E Engineer, etc, etc.  So why not ask experienced folk like us to be involved in your project team at an early stage, so that informed questions can be asked and additional information gained to better inform your remediation strategy and minimise those hidden risks and associated costs.  Or if the SI is believed to be robust, then why not undertake the project on a cost plus basis, where the client carries the risk and the contractor simply undertakes the work demonstrating all remediation costs.  Better for us and better for the clients pockets…!

And a happy client means more repeat work, which we all want.

Following on from Sam’s recent blog on how much does soil remediation cost I thought you might be interested to see how a reporter on mortgage issues, clearly with limited knowledge, is managing to scare potential home owners from buying properties developed on brownfield sites.

It is stated that…”Some 3% of all properties in the UK are affected by land contamination meaning 786,000 properties could be affected”…yes this could be true but what is the land mass of the ‘3% properties’ as opposed to the size of a ‘normal’ property used in the calculation.

Furthermore…”The average cost of cleaning up contaminated land is £250,000 per acre, meaning making right the average contaminated plot in the UK could cost £15,000.”  So is the writer assuming that all contamination, soil types, target levels, etc are the same across the UK…? Where did the £250k per acre come from…?

And…“In the regions where there is the highest risk of purchasing contaminated land, due diligence searches are less popular than in south east England.”  Could it be that more people want to live in the south east than the areas where the presence of contamination is more likely hence the reason for more searches…?

If you want to know what soil remediation treatment will cost would you not go and ask an expert rather than listen to a misinformed report…!  We are here to help, so why not drop us a line…?

The answer isn’t simple (unlike my blog writing I bet you’re thinking). Read on to get an insight.

As with all remediation costs (e.g. soil remediation cost blog) the process to calculate clean-up costs requires a lot of time with a lot of information.  The rate of clean-up is dependent upon many factors in the groundwater and the soils there in.

Water remediation can be approached using any of 4 main techniques which are summarised on our web-site here.

The costs for pump and treat, air sparging and vapour extraction (or a combination) are generally broken down in to the following-

  • Set up costs,
  • Hire of equipment,
  • Monitoring,
  • Disposal of contaminant ( for example replacement of saturated filters?), and;
  • Demobilisation.

This is mainly because the hire of equipment and disposal costs are difficult to fix as they depend upon the rate of success.  We’ll give you a good indication of time if you ask.

In-situ chemical treatment costs are calculated on a cost per treatment basis, the number of treatments can vary significantly as they depend upon rate of treatment success.

The size of site, volume of contamination, type of contaminant are crucial for putting together an indicative cost.  Phone us and we should be able to at least give you an indication right then, or if you send through some information we expect to be able to do a lot better.  Contact 0131 538 8456 and/or info@soilutions.co.uk, or find us here.

Simple.

FREE EBOOK

2026

Soil remediation guide

Approaching soil remediation without any prior knowledge can be difficult and uncomfortable at times, especially when it can potentially be very costly. This free eBook will help you understand the whats, the whys and the hows of soil remediation in the simplest terms.

What can you do with your asbestos contaminated soil?

I hope you’ve got over the shock of finding you have a problem with asbestos contaminated soils.  Dealing with asbestos is a tricky business, firstly you must find out the asbestos content of the soil, and then the nature of the asbestos (fibrous would be expensive news), you can then look at soil remediation.

Asbestos soil remediation is almost always dealt with by excavation and disposal off site, one option if all you have are asbestos containing materials (ACM) and no loose fibres, is to hand pick the ACMs and dispose of them separately.

The cost of hazardous soil removal might also help you, see this blog post here.

I’ve summarised the main regulations below which I hope will answer a few more questions.  The EIC/CL:AIRE and CIRIA announced a Collaborative Agreement on Industry Guidance and Code of Practice on Asbestos in Soil on  3rd February 2012.  We’re all looking forward to some clearer guidance in the future.  If you have any questions then drop us a line (0131 538 8456) or e-mail (info@soilutions.co.uk), we’ll be happy to  help you.

Both The Hazardous Waste (England and Wales) Regulations 2005 and The Special Waste Amendment (Scotland) Regulations 2004, require that any waste having an asbestos content greater than 0.1% weight/weight (w/w) is classified as Hazardous Waste. Any waste with an asbestos content of less than 0.1% w/w can be classified as non hazardous waste, unless there are other contaminants present which would make the waste hazardous.

Where fibrous asbestos is present at concentrations greater than 0.001%, these can be considered to pose a risk to human health and must be dealt with as hazardous soils for disposal purposes.

Where the asbestos is deemed to be of a fibrous nature the HSE require that the handling of the material is undertaken by a suitably licensed company. The Carriage of Dangerous Goods (etc) Regulations 2009 (CDG2009) applies in this instance.

You local council Contaminated Land Officer and/or Environmental Health Officer should be able to help you understand your responsibilities, however we recommend going to them prepared with knowledge of your problem and your proposed solution.

FREE EBOOK

2026

Soil remediation guide

Approaching soil remediation without any prior knowledge can be difficult and uncomfortable at times, especially when it can potentially be very costly. This free eBook will help you understand the whats, the whys and the hows of soil remediation in the simplest terms.

 

Thanks for the feedback on my post re: cost of soil remediation, it seems however that you want more information on this topic, after all money is the bottom line and anyone who has dabbled in the contaminated land sector will know it can cost you a few pounds to sort out serious issues.

Assuming your hazardous soils can be transported and the landfill will take them, start with landfill tax (currently £102.10/tonne as of April 2023), gate prices are generally in the range of £70-185 / tonne, excavation and haulage can vary significantly, of course get in contact for an estimate if you’re interested.

Nothing is ever that simple however, some hazardous materials are in such bad condition (forming more of a slurry than a soil for example) that they require pre-treatment before disposal.  Generally the actual pre-treatment is simple, the awkward part can be designing the treatment and getting approval from landfill operators and/or regulators.

As always we’re here to help and give you advice, contact us on 0131 538 8456 or e-mail at info@soilutions.co.uk

FREE EBOOK

2026

Soil remediation guide

Approaching soil remediation without any prior knowledge can be difficult and uncomfortable at times, especially when it can potentially be very costly. This free eBook will help you understand the whats, the whys and the hows of soil remediation in the simplest terms.


It has been reported that the majority of the money will go to Glasgow, £3.7m, with North Lanarkshire getting £2m as they are deemed the two areas with the worst problems.  Dundee gets £1.4m, with South Lanarkshire receiving £1.5m and the Highlands £1.2m.  So if my maths is correct that leaves £0.2m for the other 27 unitary authorities – way to go…!

Infrastructure Secretary, Alex Neil, was quoted as saying; “The Vacant and Derelict Land Fund is making a full contribution towards our goal of increased sustainable economic growth across Scotland.”  I don’t see how £0.2m for 27 authorities can make a full contribution towards a goal of sustainable economic growth across Scotland, can you…?

He also said; “Councils will, of course, agree their local priorities, but I believe that this fund has the potential to kick-start significant economic development” and “This fund has the potential to enrich communities across Scotland by bringing back into use land that has lain derelict for many years”. £0.2m between 27 authorities gives them potentially £7,407.41 each (I rounded up the pence to be fair and reasonable…!).  A way to go – watch out SME’s there’s loads of work coming our way…!

Since being established in 2004, the fund has assisted with the reuse of 150 hectares of land from the Scottish Vacant and Derelict Land Register.  Now it’s Friday, my brain is tired and the calculator’s having a meltdown but I reckon that with 10,771 hectares to be tidied up, remediated, etc, we’ve a long way to go and £10m isn’t nae going to go far but at least it’s a something…!

The government survey in 2010, estimated there were 10,771 hectares of derelict land across Scotland over approx 4,000 sites.  North Lanarkshire topped the tables with 1,439 hectares with Glasgow City a close second with 1,322 hectares.

With such a lack of government support I presume they are relying on developers to foot the bill of our industrial legacy.  If your one of these poor souls and are looking for a cost effective option drop us a line for some impartial free advice.